HK Electric – Feed-in Tariff Scheme

Introduction
HK Electric establishes and operates a Feed-in Tariff Scheme (the FiT Scheme) and the arrangement of connection (the Grid Connection) to HK Electricā€™s electricity grid (the Grid) for renewable energy power systems (the REPS) of HK Electricā€™s customers under its 2019-2033 Scheme of Control Agreement (the SCA).
The FiT Scheme and Grid Connection, including their arrangement and terms and conditions, are subject to joint review (the Joint Review) by HK Electric and the HKSAR Government under the SCA from time to time. The FiT Scheme and Grid Connection are open for application until 31 December 2033, or a date subject to the Joint Review, whichever is earlier.

  • Webpage link: HK Electric – Feed-in Tariff Scheme
  • Application qualification: (i) the applicant (the Applicant) is a registered customer (the Customer) of a HK Electricā€™s electricity account (the Electricity Account); (ii) the REPS is located within the area covered by the Electricity Account (the Service Address); (iii) the REPS is not undertaken or owned by the HKSAR Government including the Government schools; (iv) the REPS comprises only solar photovoltaic (PV) system and/or wind power system; and (v) the REPS is not connected to any non-renewable energy source or energy storage facility, which may affect the reading of the respective meter(s) (the RE Meter(s)) for measuring electricity generated from the REPS.
  • Membership:

    N/A